KBM
SERVICES
LIMITED


Clients & Case Studies
We have recently worked on a range of different projects as discussed below

Hundred of Hoo Academy
​​Following a new commercial kitchen installation we completed in 2021, we have upgraded to site once more, altering the locations of the catering appliances and gas supplies, installing a new 3 phase electrical supply to be able to get a new 20 grid Rational Combination oven to meet requirements.
Westlands Secondary School
Completion of upgrade to their food technology class rooms to comply with specifications of IGEM/UP/11 to have full gas fan interlock, air quality control monitoring and gas proving systems.​


St Margarets Church
Design and upgrade of their plant room to meet their budget friendly requirement for two new Remeha Quinta Ace boilers.
Woodlands Family Practice
Completion of first and second fix of water and central heating upgrades to accommodate 14 new consultation rooms, carrying out works around surgery times and keeping works and associated disturbancces to a minimum.


Domestic property Sittingbourne
Complete Bathroom renovation, taking it back to brickwork to having newly tiled floors and walls, a freestanding bath, along with a new handwash basin and high-level period-style toilet.
​
Northfleet School For Girls
Following the breakdown of the master boiler, we were able to supply and install a new Ideal Evomax 2 boiler and get back to full capacity quickly.
​


Rochester Independent College
Having already completed various works on site from carcass testing and boiler serving we have also taken onboard their new northbank building and completed its first major service including clorination cleaning and services to TMV's and AHU's.
West Thornton Primary- Croydon
Removal of several old catering appliances with the supply and installation of x2 6 Grid ratiional ovens tier'd with an ultravent system to make space under the canopy for a new fryer and x2 turbofan ovens.
​


Waterfront UTC
Under the pre-planned maintenance schedule, we were able to organise the installation of x3 new Ideal Evomax 2 boilers in the half term to make sure the school is ready to meet the increasing demands.
​
Halfway Houses Primary School
The supply and installation of a new commercial dishwasher in the school kitchen was attended to, quoted and installed within 2 days.


Bexley Leigh Academy
Following the breakdown of the inlet fan in their kitchen, we were able to source a new Helious Gigabox 560/3PH fan and get it installed quick enough to not disrupt their catering needs.
Queen Elizabeth's Grammar
Replacement of 2" steel pipework on the heating circuit between the boilers and hot water cylinders. While also servicing the cylinders and heat exchangers during these works.
